Strengthening Dubai’s logistics landscape, Agnice delivered the Masterglobal Logistics complex in 10 months, equipped with advanced environmental and security systems to support high-volume, high-integrity operations.
Strengthening Dubai’s logistics infrastructure, Agnice delivered the Masterglobal Logistics complex within a 2 + 8 month timeframe. The facility was designed and built to meet the highest operational standards including a positive pressure air system that reduces dust contamination and controls humidity to maintain clean and stable storage conditions.
A state-of-the-art security network including full CCTV coverage and card-swipe access gates was also integrated to ensure safe and efficient operations. This combination of precision engineering, advanced environmental controls and robust security establishes the facility as a benchmark for logistics efficiency in the region.
That’s why we listen to your needs and partner on your journey.
Consult Now